Event Center Milchwerk
Radolfzell / Germany

Special TRUMPF 95 track system with curtains made of Sheer Muslin CS


Project

  • Modernisation and atmospheric improvement of the old lobby.
  • Manufacture and installation of white Sheer Muslin CS curtains; without vertical seams; in total 88.00 m (96,2 yds.) long.
  • TRUMPF 95 track system guides visitors to certain areas.
 

Client

  • City of Radolfzell / Milchwerk Radolfzell
 

Location

  • Radolfzell / Germany